Project

General

Profile

Actions

Task ARCH-61

closed

Added by Kenneth Schuetz about 1 year ago. Updated 10 months ago.

Status:
Done
Assignee:
Priority:
Medium
Due date:
02/23/2025
Start date:
02/17/2025
Sprint:
-
Estimated time:
2:00 h
Target version:
Category:
Interactive Objects
Story point estimate:
-

Description

User Story

As a player, I want to activate trigger mechanisms, so that I can solve environmental challenges and unlock new paths.

Description

‌- Trigger mechanisms can be physical (buttons, levers) or magical (elemental runes, sigils).

  • Some mechanisms require specific spells to activate (e.g., Fire ignites a rune, Water deactivates an energy field).
  • Activating a trigger may open doors, disable traps, or move platforms.
  • Some triggers are timed and reset if not activated within a certain period.
  • Certain puzzles require multiple activations (e.g., two switches must be pressed at the same time).

Test Cases

  • Verify that interacting with a trigger mechanism activates the correct event.
  • Ensure that elemental triggers only respond to the correct spell type.
  • Confirm that timed triggers reset if not activated in time.
  • Validate that trigger-based events (e.g., doors opening, platforms moving) function properly.
  • Ensure that multiple activation switches work correctly for linked puzzles.
Actions #1

Updated by Karl Estabine about 1 year ago

  • Translation missing: en.field_position changed from 63 to 29
Actions #2

Updated by Kenneth Schuetz about 1 year ago

  • Tracker changed from Epic to Task
  • Due date set to 02/23/2025
  • Parent task set to Epic ARCH-180: Interactive Objects
  • Translation missing: en.field_sprint changed from 6 to 8
Actions #3

Updated by Kenneth Schuetz about 1 year ago

  • Status changed from To Do to Impediment
  • Assignee set to Kenneth Schuetz
Actions #4

Updated by Kenneth Schuetz about 1 year ago

  • Status changed from Impediment to To Do
  • Assignee deleted (Kenneth Schuetz)
Actions #5

Updated by Kenneth Schuetz about 1 year ago

  • Status changed from To Do to In Progress
  • Assignee set to Karl Estabine
Actions #6

Updated by Kenneth Schuetz about 1 year ago

  • Estimated time set to 2:00 h
Actions #7

Updated by Kenneth Schuetz 10 months ago

  • Status changed from In Progress to Done
Actions

Also available in: Atom PDF

MstSage Entertainment Code Repo/Project Manager