Actions
Task #144
closedUser Story #345: Range / Magic Moves
Geo Surge (Earth)
Start date:
02/10/2025
Due date:
% Done:
0%
Estimated time:
1:30 h
Story Points:
1
Difficulty:
Low
Blocked:
No
Sprint:
Description
User Story¶
As a player, I want to hurl rocks at my target using magic, so that I can deal solid impact damage and interact with other elements.
Description¶
- Launches rock projectiles at enemies, dealing direct impact damage.
- Can be used as a single-target rock throw or a rapid-fire stone barrage.
- Wind Interaction: Increases projectile speed and spreads dust, reducing enemy accuracy (Blinded).
- Fire Interaction: Superheats the rocks, turning them into molten projectiles with a Burning effect.
- Earth Interaction: Strengthens the attack, increasing knockback and stagger potential.
Test Cases¶
- Verify that Geo Surge deals impact damage when hitting a target.
- Ensure that Geo Surge can be fired as either a single large rock or multiple smaller projectiles.
- Confirm that combining Geo Surge with Wind increases projectile speed and spreads dust (Blinded effect).
- Validate that combining Geo Surge with Fire turns rocks into molten projectiles, applying Burning.
- Ensure that combining Geo Surge with Earth increases knockback and stagger effects.
- Check that Geo Surge does not work if the player is out of mana (if applicable).
Updated by Kenneth Schuetz 3 months ago
- Subject changed from Game can be played on any monitor/TV set to UI / Interface (Extended)
Updated by Kenneth Schuetz 3 months ago
- Subject changed from UI / Interface (Extended) to Geo Surge (Earth)
- Description updated (diff)
- Category set to Range / Magic Moves
- Priority changed from Medium to High
- Target version changed from Beta to Alpha
- Start date changed from 02/17/2025 to 02/10/2025
- Difficulty set to Medium
- Standalone PBI changed from No to Yes
Updated by Kenneth Schuetz 3 months ago
- Sprint changed from Product backlog to Alpha Sprint
- Position changed from 22 to 13
Updated by Kenneth Schuetz 3 months ago
- Sprint changed from Alpha Sprint to Sprint Backlog (Alpha)
- Position changed from 13 to -11
Updated by Kenneth Schuetz 3 months ago
- Assignee set to Kenneth Schuetz
- Priority changed from High to Medium
- Estimated time set to 1:30 h
- Story Points set to 1
Updated by Kenneth Schuetz 3 months ago
- Sprint changed from Sprint Backlog (Alpha) to Alpha Sprint
- Position changed from 55 to 19
Updated by Kenneth Schuetz 3 months ago
- Tracker changed from User Story to Task
- Parent task set to #345
- Standalone PBI deleted (
Yes)
Updated by Kenneth Schuetz 3 months ago
- Status changed from In Progress to Code Review
Updated by Kenneth Schuetz 3 months ago
- Status changed from Code Review to Testing
Actions