Project

General

Profile

Actions

Task ARCH-145

closed

Epic ARCH-172: Developer Beta

Final Debug Tools Cleanup

Added by Kenneth Schuetz about 1 year ago. Updated 10 months ago.

Status:
Done
Assignee:
Priority:
High
Due date:
02/23/2025
Start date:
02/17/2025
Sprint:
-
Estimated time:
4:00 h
Target version:
Category:
Developer Beta
Story point estimate:
-

Description

User Story

As a developer, I want to remove debugging tools and logs from the final build, so that I can ensure a clean and optimized game for players.

Description

  • All developer debugging tools and overlays are disabled.
  • Debugging logs and error reporting are removed from the final release.
  • Game runs without extra debug processing overhead.

Test Cases

  • Verify that all debug console logs are removed from the game.
  • Ensure that no developer hotkeys or testing commands remain enabled.
  • Confirm that the game runs normally without debug overlays.
  • Validate that debugging scripts no longer impact performance.
Actions #1

Updated by Karl Estabine about 1 year ago

  • Translation missing: en.field_position changed from 149 to 81
Actions #2

Updated by Kenneth Schuetz about 1 year ago

  • Tracker changed from Epic to Task
  • Due date set to 02/23/2025
  • Parent task set to Epic ARCH-172: Developer Beta
  • Translation missing: en.field_sprint changed from 6 to 10
Actions #3

Updated by Kenneth Schuetz about 1 year ago

  • Assignee set to Kevin Winters
  • Estimated time set to 4:00 h
Actions #4

Updated by Kenneth Schuetz about 1 year ago

  • Translation missing: en.field_sprint changed from 10 to 8
Actions #5

Updated by Kenneth Schuetz 10 months ago

  • Status changed from To Do to Done
Actions

Also available in: Atom PDF

MstSage Entertainment Code Repo/Project Manager