Task ARCH-59

closed

Epic ARCH-166: Interactive Objects

Interactive Doors & Portals

Added by Kenneth Schuetz about 1 year ago. Updated about 1 year ago.

Status:
Done
Assignee:
Priority:
Medium
Due date:
Start date:
02/10/2025
Sprint:
-
Estimated time:
4:00 h
Target version:
Category:
Interactive Objects
Story point estimate:
-

Description

User Story

As a player, I want to open doors and use portals, so that I can move between areas and allow enemies to do the same when applicable.

Description

  • Doors can be opened by both the player and enemies.
  • Some doors may be locked or require a condition to open.
  • Portals instantly transport the player to another location in the level.

Test Cases

  • Verify that players can open doors by interacting with them.
  • Ensure that enemies can pass through doors if applicable.
  • Confirm that portals correctly transport the player to the intended destination.
  • Validate that locked doors remain inaccessible until the required condition is met.
  • Ensure that doors and portals have appropriate visual and audio feedback when used.
Actions #1

Updated by Kenneth Schuetz about 1 year ago

  • Subject changed from Interactive Doors & Portalsv to Interactive Doors & Portals
Actions #2

Updated by Kenneth Schuetz about 1 year ago

  • Translation missing: en.field_sprint changed from 6 to 7
  • Translation missing: en.field_position changed from 60 to 33
Actions #3

Updated by Kenneth Schuetz about 1 year ago

  • Translation missing: en.field_sprint changed from 7 to 9
  • Translation missing: en.field_position changed from 33 to -31
Actions #4

Updated by Kenneth Schuetz about 1 year ago

  • Translation missing: en.field_position changed from -31 to 34
Actions #5

Updated by Kenneth Schuetz about 1 year ago

  • Translation missing: en.field_position changed from 34 to 33
Actions #6

Updated by Kenneth Schuetz about 1 year ago

  • Translation missing: en.field_position changed from 33 to 32
Actions #7

Updated by Kenneth Schuetz about 1 year ago

  • Translation missing: en.field_position changed from 32 to 33
Actions #8

Updated by Kenneth Schuetz about 1 year ago

  • Translation missing: en.field_position changed from 33 to 34
Actions #9

Updated by Kenneth Schuetz about 1 year ago

  • Translation missing: en.field_position changed from 34 to 35
Actions #10

Updated by Kenneth Schuetz about 1 year ago

  • Translation missing: en.field_position changed from 35 to 36
Actions #11

Updated by Kenneth Schuetz about 1 year ago

  • Translation missing: en.field_position changed from 36 to 37
Actions #12

Updated by Kenneth Schuetz about 1 year ago

  • Translation missing: en.field_position changed from 37 to 38
Actions #13

Updated by Kenneth Schuetz about 1 year ago

  • Translation missing: en.field_position changed from 38 to 39
Actions #14

Updated by Kenneth Schuetz about 1 year ago

  • Assignee set to Chris Wilt
  • Priority changed from High to Medium
  • Estimated time set to 4:00 h
  • Translation missing: en.field_sprint changed from 9 to 7
  • Translation missing: en.field_position changed from 39 to 41
Actions #15

Updated by Kenneth Schuetz about 1 year ago

  • Tracker changed from Epic to Task
Actions #17

Updated by Kenneth Schuetz about 1 year ago

  • Status changed from To Do to Done
Actions

Also available in: Atom PDF