Actions
Task ARCH-21
closedGeo Surge (Earth)
Start date:
02/10/2025
Due date:
% Done:
0%
Estimated time:
1:30 h
Story Points:
1
Impediment:
No
Sprint:
Description
User Story¶
As a player, I want to hurl rocks at my target using magic, so that I can deal solid impact damage and interact with other elements.
Description¶
- Launches rock projectiles at enemies, dealing direct impact damage.
 - Can be used as a single-target rock throw or a rapid-fire stone barrage.
 - Wind Interaction: Increases projectile speed and spreads dust, reducing enemy accuracy (Blinded).
 - Fire Interaction: Superheats the rocks, turning them into molten projectiles with a Burning effect.
 - Earth Interaction: Strengthens the attack, increasing knockback and stagger potential.
 
Test Cases¶
- Verify that Geo Surge deals impact damage when hitting a target.
 - Ensure that Geo Surge can be fired as either a single large rock or multiple smaller projectiles.
 - Confirm that combining Geo Surge with Wind increases projectile speed and spreads dust (Blinded effect).
 - Validate that combining Geo Surge with Fire turns rocks into molten projectiles, applying Burning.
 - Ensure that combining Geo Surge with Earth increases knockback and stagger effects.
 - Check that Geo Surge does not work if the player is out of mana (if applicable).
 
Updated by Kenneth Schuetz 9 months ago
- Subject changed from Game can be played on any monitor/TV set to UI / Interface (Extended)
 
Updated by Kenneth Schuetz 9 months ago
- Subject changed from UI / Interface (Extended) to Geo Surge (Earth)
 - Description updated (diff)
 - Category set to Range / Magic Moves
 - Priority changed from Medium to High
 - Target version changed from Beta to Alpha
 - Start date changed from 02/17/2025 to 02/10/2025
 - Standalone PBI changed from No to Yes
 
Updated by Kenneth Schuetz 9 months ago
- Sprint changed from Product backlog to Alpha Sprint
 - Position changed from 22 to 13
 
Updated by Kenneth Schuetz 9 months ago
- Sprint changed from Alpha Sprint to Sprint Backlog (Alpha)
 - Position changed from 13 to -11
 
Updated by Kenneth Schuetz 9 months ago
- Assignee set to Kenneth Schuetz
 - Priority changed from High to Medium
 - Estimated time set to 1:30 h
 - Story Points set to 1
 
Updated by Kenneth Schuetz 9 months ago
- Sprint changed from Sprint Backlog (Alpha) to Alpha Sprint
 - Position changed from 55 to 19
 
Updated by Kenneth Schuetz 9 months ago
- Tracker changed from Epic to Task
 - Parent task set to #345
 - Standalone PBI deleted (
Yes) 
Updated by Kenneth Schuetz 9 months ago
- Status changed from To Do to In Progress
 
Updated by Kenneth Schuetz 9 months ago
- Status changed from In Progress to Review
 
Actions